Electric Standards Spotlight
Electric Standards
To view the documents on this page, you will need to have Adobe Reader. You can download Adobe Reader by
clicking here.
The Complete 2008 Electric Service Standards
(this download may take a few minutes)
2008 Service Standards Index
2008 Service Standards Supporting Text
(this download may take a few minutes)
O.H. Customer Meter Pole 100A
O.H. Customer Meter Pole 200A
O.H. Gutter Service 2-Meters
O.H. Gutter Service 6-Meters
O.H. Gutter Service With Main Disconnect
O.H. Meter Base Applications
O.H. Meter Stack 2-Meters
O.H. Meter Stack 6-Meters
O.H. Meter Stack With Main Disconnect
O.H. Panel Connection Detail
O.H. Primary Meter Installation
O.H. Quadraplex Service Connections
O.H. Service 200A
O.H. Service 320A
O.H. Service Attachments
O.H. Service Clearances
O.H. Service Conductor Applications
O.H. Service Entrance Conductors
O.H. Single Phase 400A Bolt-In
O.H. Single Phase CT Installation
O.H. Standard Service Drop Conductors
O.H. Temporary Service
O.H. Three Phase 400A Bolt-In
O.H. Three Phase CT Installation
U.G. Gutter Service 6-Meters
U.G. Gutter Service With Main Disconnect
U.G. Meter Base Applications
U.G. Meter Stack 2-Meters
U.G. Meter Stack 6-Meters
U.G. Meter Stack With Main Disconnect
U.G. Non-Gutter Service 6-Meters
U.G. Panel Connection Detail
U.G. Primary Meter Cabinet
U.G. Secondary Junction Cabinet
U.G. Service 200A
U.G. Service 320A
U.G. Service Detail
U.G. Service Lateral Conductors
U.G. Service Meter Pedestal
U.G. Single Phase 400A Bolt-In
U. G. Single Phase CT in Transformer
U.G. Single Phase CT Installation
U.G. Temporary Service
U.G. Three Phase 400A Bolt-In
U.G. Three Phase CT In Transformer
U.G. Three Phase CT Installation