Experience has shown that uniform standards for installation, materials, and system design are the best way to provide the maximum service to customers.
General Standards Information
Overhead Standards
- Overhead Drawings Index
- SO-GN1 Service Entrance Conductors
- SO-GN2 Meter Base Applications
- SO-GN3 Standard Service Drop Calculator
- SO-GN4 Service Drop Conductor Application Guide
- SO-GN5 Panel Connection Details
- SO-CLEAR Commercial/Residential Service Clearances
- SO-ATT Service Attachments
- SO-CONN Quadraplex Connections
- SO-TEMP Overhead Temporary
- SO-200 Service 0-200 Amp
- SO-320 Service 201-300 Amp
- SO-MP100 Customer Meter Pole 100A
- SO-MP200 Customer Meter Pole 200A
- SO-1Ø-400 Single Phase 400 Amp Bolt-In
- SO-3Ø-400 Three Phase 400 Amp Bolt-In
- SO-1Ø-CT Single Phase CT Installation
- SO-3Ø-CT Three Phase CT Installation
- SO-PM Three Phase Primary Meter Installation
- SO-MG2 Gutter Service 2-Meters
- SO-MS2 Meter Stack 2-Meters
- SO-MG6 Gutter Service 6-Meters
- SO-MS6 Meter Stack 6-Meters
- SO-MGM Gutter Service with Main Disconnect 7-24 Meters
- SO-MSM Meter Stack with Main Disconnect 7-24 Meters
Underground Standards
- Underground Drawings Index
- SU-GN1 Service Lateral Conductors
- SU-GN2 Meter Base Applications
- SU-GN3 Panel Connection Details
- SU-DET Service Details
- SU-TEMP Underground Temporary
- SU-200 Service 0-200 Amp
- SU-320 Service 201-300 Amp
- SU-M-PED Service Meter Pedestal
- SU-1Ø-400 Single Phase 400 Amp Bolt-In
- SU-3Ø-400 Three Phase 400 Amp Bolt-In
- SU-1Ø-CT Single Phase CT Installation
- SU-3Ø-CT Three Phase CT Installation
- SU-T1-CT Single Phase CT in Transformer
- SU-T3-CT Three Phase CT in Transformer
- SU-PM Three Phase Primary Meter Cabinet
- SU-SJC Secondary Junction Cabinet
- SU-MS2 Meter Stack 2-Meters
- SU-MG6 Gutter Service 6-Meters
- SU-M6 Non-Gutter Service 6-Meters
- SU-MS6 Meter Stack Service 6-Meters
- SU-MGM Gutter Service with Main Disconnect 7-24 Meters
- SU-MSM Meter Stack with Main Disconnect 7-24 Meters