Coal Combustion Residuals (CCR) Rule Compliance Data and Information
This website is intended to satisfy the requirement under the CCR Rule (section 257.107) to maintain a publicly accessible internet site (CCR website) containing the information specified in that section. The required information will be posted when it is accomplished and is available.
For more information, please contact Environmental Affairs at City Utilities, (417) 863-9000, or email ccr@cityutilities.net

James River Power Station (JRPS)

John Twitty Energy Center (JTEC)
James River Power Station (JRPS)
JRPS - Temporary Holding Pond
(West and East cells – Closure by removal completed prior to April 18, 2017 and June 30, 2017, respectively)
Federal CCR Citation | Description | Links |
§ 257.80(b)(5) | Fugitive dust control plan | – Initial |
§ 257.80(c) | Annual CCR fugitive dust control report |
– 2017 – 2018 |
§ 257.100(e)(4)(iv) | Annual inspection report | |
§ 257.102(c) | Final closure by removal (Clean Closure) verification | |
§ 257.102(g); or § 257.100(e)(1)(iii) |
Notification of intent to close CCR unit | |
§ 257.103(c)(1); § 257.100(c)(2)(i) or § 257.100(c)(2)(ii) |
Periodic progress reports | – Final |
§ 257.102(h); or § 257.100(b)(5) and (6) and (c)(3) |
Notification/certification of completion of closure |
JRPS - Utility Waste Landfill
Federal CCR Citation | Description | Links |
§ 257.64(d)(1) | Unstable areas demonstration | – Appendix A. 3D ERT profiles – Appendix B. MASW data – Appendix C. Borehole data – Appendix D. AE slope stability report |
§ 257.80(b)(5) | Fugitive dust control plan | |
§ 257.80(c) | Annual CCR fugitive dust control report | – 2017 – 2018 – 2019 – 2020 – 2021 – 2022 |
§ 257.81(c)(3) | Run-on and run-off control system plan | – 2021 |
§ 257.84(b)(3) | Annual inspection |
– Initial – 2016 – 2017 – 2018 – 2019 – 2020 – 2021 – 2022 |
§ 257.90(e) | Annual groundwater monitoring and corrective action report |
– 2017 – 2018 – 2019 – 2020 – 2021 – 2022 |
§ 257.91(f) and § 257.90(b)(1)(i) |
Groundwater monitoring system certification | |
§ 257.93(f)(6) and § 257.90(b)(1)(i) |
Statistical method certification | |
§ 257.94(e)(3) | Notification that an assessment monitoring program has been established | |
§ 257.102(b)(2) | Initial closure plan | |
§ 257.102(e)(2)(ii) | Notification of Closure Initiation Extension | – 2021 – 2023 |
§ 257.104(d)(2) | Initial post-closure care plan |
John Twitty Energy Center (JTEC)
JTEC - Temporary Holding Pond
(East and West cells) – Closure by removal completed prior to September 30, 2016
JTEC - Utility Waste Landfill
Federal CCR Citation | Description | Links |
§ 257.64(d)(1) | Unstable areas demonstration | – Appendix A. Landfill Geotechnical Reports – Appendix B. ERT Data – Appendix C. MASW Data – Appendix D. Drilling/Coring Data |
§ 257.80(b)(5) | Fugitive dust control plan | |
§ 257.80(c) | Annual CCR fugitive dust control report | – 2017 – 2018 – 2019 – 2020 – 2021 – 2022 |
§ 257.81(c)(3) | Run-on and run-off control system plan | – 2021 |
§ 257.84(b)(3) | Annual inspection | – Initial – 2016 – 2017 – 2017 Supplemental – 2018 – 2019 – 2020 – 2021 – 2022 |
§ 257.90(e) | Annual groundwater monitoring and corrective action report | – 2017 – 2018 – 2019 – 2020 – 2021 – 2022 |
§ 257.91(f) and § 257.90(b)(1)(i) |
Groundwater monitoring system certification | – Initial – 2020 |
§ 257.93(f)(6) and § 257.90(b)(1)(i) |
Statistical method certification | |
§ 257.94(e)(3) | Notification that an assessment monitoring program has been established | |
§ 257.95(g) | Notification that Appendix IV constituents have been detected at SSI above GWPS | – October 10, 2018 – July 25, 2019 – October 15, 2019 – January 15, 2020 – March 26, 2020 – June 12, 2020 – September 25, 2020 |
§ 257.102(b)(2) | Initial closure plan | |
§ 257.104(d)(2) | Initial post-closure care plan |
If you are having difficulty downloading these files, try right-clicking on the link and then choosing “Save Link As…”